BULGARIA – TURKEY IPA CROSS-BORDER PROGRAMME
Published on BULGARIA – TURKEY IPA CROSS-BORDER PROGRAMME (http://www.ipacbc-bgtr.eu)

Home > Important! Modification of the complaint procedure on the technical and quality assessment and selection under the Second Call for Proposals

Important! Modification of the complaint procedure on the technical and quality assessment and selection under the Second Call for Proposals

19.12.2018

The complaint procedure after the technical and quality assessment and selection under the Second Call for Proposals of the Bulgaria-Turkey Interreg – IPA CBC Programme was amended by decision of the Joint Monitoring Committtee from 13 December 2018. Changes were introduced in point 2 “Complaint after the technical and quality assessment” of Attachment 3 “Complaint procedure” to the Guidelines for Applicants.

The amended procedure does not any longer envisage the Lead partners to be required to request from the Managing Authority the technical grid, containing the average scores and summarized comments of the assessors. The technical grid is being sent by the Managing Authority to all Lead partners under projects in the reserves list and rejected proposals as attachment to the notification letter for selection results. Therefore, complaint may be officially lodged not later than 7 working days after receipt of the notification letter for assessment and selection results.

Amended Attachment 3 “Complaint procedure” to the Guidelines for Applicants is available HERE [1].

EC flagThe web-site is co-funded by the European Union through the Interreg-IPA Cross-border Programme Bulgaria–Turkey.
This publication has been produced with the assistance of the European Union. The contents of this publication are the sole responsibility of 
the Ministry of Regional Development and Public Works of Republic of Bulgaria and can in no way be taken to reflect the views of the European Union.


Source URL: http://www.ipacbc-bgtr.eu/second-call-application-stage-news/important-modification-complaint-procedure-technical-and-quality

Links
[1] http://www.ipacbc-bgtr.eu/sites/ipacbc-bgtr-105.gateway.bg/files/uploads/2nd_call/attachment_3_-_complaint_procedure_bg-tr_rev_jmc_13_december_2018.pdf