BULGARIA – TURKEY IPA CROSS-BORDER PROGRAMME
Published on BULGARIA – TURKEY IPA CROSS-BORDER PROGRAMME (http://www.ipacbc-bgtr.eu)

Home > Tender procedure for Works for “Small scale construction of the main road connecting stone Monastery with the fortress wall gates in Kiyikoy” within project CB005.2.21.046

Tender procedure for Works for “Small scale construction of the main road connecting stone Monastery with the fortress wall gates in Kiyikoy” within project CB005.2.21.046

31.03.2020

Tender procedure for Works for “Small scale construction of the main road connecting stone Monastery with the fortress wall gates in Kiyikoy” within project CB005.2.21.046

Publication reference: CBC-BGTR-WORKS-046-PP2

 

Kiyikoy Municipality Administration intends to award a work contract for small scale construction works in the road connecting St. Nikola Monastery to the fortress wall gates in Kiyikoy/Vize/ Kırklareli – Turkey with financial assistance from the Interreg-IPA Bulgaria –Turkey CBC Programme within project CB005.2.21.046 “ROADS to the Sustainable Tourism”. The tender dossier is available for inspection at Kıyıköy Municipality, Cumhuriyet Mah. Erguvan Sok. No:2 39480 Kıyıköy/ Vize/ Kırklareli – Turkey and published on the website of the programme http://www.ipacbc-bgtr.eu/public-tenders [1] and the facebook site of the municipality: https://www.facebook.com/people/TC-K [2]ıyıköy-Belediye-Başkanlığı/100039055822847.

 

The deadline for submission of tender is 8 May 2020, 17:30 h local time.

Possible additional information or clarifications/questions shall be published on the website of the programme http://www.ipacbc-bgtr.eu/public-tenders [1] and the facebook site of the municipality: https://www.facebook.com/people/TC-K [2]ıyıköy-Belediye-Başkanlığı/100039055822847.

The tender dossier is attached below:

File tender_dossier_pp2-046-works.rar [3]

EC flagThe web-site is co-funded by the European Union through the Interreg-IPA Cross-border Programme Bulgaria–Turkey.
This publication has been produced with the assistance of the European Union. The contents of this publication are the sole responsibility of 
the Ministry of Regional Development and Public Works of Republic of Bulgaria and can in no way be taken to reflect the views of the European Union.


Source URL: http://www.ipacbc-bgtr.eu/public-tenders/tender-procedure-works-small-scale-construction-main-road-connecting-stone-monastery

Links
[1] http://www.ipacbc-bgtr.eu/public-tenders
[2] https://www.facebook.com/people/TC-K
[3] http://www.ipacbc-bgtr.eu/sites/ipacbc-bgtr-105.gateway.bg/files/tender_dossier_pp2-046-works.rar